Wall & Floor Mount AC & Fast DC Chargers

WALL MOUNTED

7kW, 11kW, 22,kW AC
Free APP, 
3-Year Warranty, 
Remote Control and Monitoring, 
Built in Earthing Solution (EV07s Pro),
Power Modulation, 
Untethered, 
RFID, OCPP1.6, 
RCD type-b Equivalent, 
On Board RCD isolation,
Smart,Wi-Fi & Ethernet Built In,
Full Range of Accessories Available
OLEV Approved

FLOOR STANDING

2x7KW & 2x22kw AC
Free APP,
3-Year Warranty,
Remote Control and Monitoring,
Power Modulation,
Untethered,
RFID, OCPP1.6,
On Board RCD isolation,
Smart Wi-Fi & Ethernet Built In,
Full Range of Accessories Available,
OLEV Approved

MANUFACTURED BY ATESS

Shenzhen Atess Power Technology Co.,Ltd is a company focuses on developing and manufacturing of storage inverters and EV chargers, it has an R&D team with more than 50 experienced engineers, ensures products with leading-edge technology and excellent quality. almost 10 years in the industry, its products have been installed worldwide.

Atess Power Technology provides storage inverters including hybrid all-in-one solution and battery inverters from 10 kW up to 630kW covering both rooftop application and utility grade ground mount projects. the EV charger product line on the other hand provides 3kW up to 150kW AC and DC chargers covering home and public charging station, compatible with all regular EVs available in the market, and also buses for public transportation.

Dedicated to providing global customers with excellent products as well as comprehensive services, Atess Power Technology keeps on exploring new technology, and continuously strengthen its team worldwide.

DOMESTIC CHARGING

Electric vehicle users can receive funding from OLEV (Office for Low Emission Vehicles) to install a home charger for their plug-in vehicle through the Electric Vehicle Home charge Scheme. This provides a grant of up to 75% of the eligible costs of charge point installation* for the registered keeper, lessee or nominated primary user of a new or second-hand eligible electric vehicle

To receive funding or grant aid the customer must use an OLEV accredited supplier. Project EV are fully OLEV accredited meaning you can take advantage ofany available grants

*capped £350, Inc. VAT

CUSTOMER REQUIREMENTS
  • Customer must have off street parking attached to the property, garage or driveway.
  • Property must be a dwelling
  • Grant of up to £350 for 75% of the total cost of the installation
  • Only one charge point per house, unless they have 2x eligible vehicles. Max is 2x charge points
  • Obtained the vehicle, new or used, on or after 1st October 2016
  • Customer must be registered keeper / lease or have the vehicle on order to arrive within 4 months (with paperwork)

COMMERCIAL CHARGING

BENEFIT IN KIND

The Government announced at the Autumn Budget 2017 that employer provided electricity, supplied from workplace charge points, for charging employees’ own electric vehicles, is exempt from being taxed as a BIK (benefit in kind) from 6th April 2018.

NEED FOR YOUR BUSINESS
  • Incentivise Staff
  • Charge existing fleet vehicles
  • To provide a service for visitors
  • Improve your green credentials

An OLEV grant (WCS workplace grant scheme) of up to £350 per charge point (up to 75% of the cost) of the can be applied for up to a maximum of 20 charge points.

ECA (Enhanced Capital Allowance)

Electric Car Chargers are eligible for ECA (Enhanced Capital Allowances, giving 100% relief in the year of expenditure (between 23rd Nov 2016 and 31st March 2019). There is a provision to extend this period further than March 2019, however this is not guaranteed.

Your business applies for a voucher through the scheme and this is handed to us Project EV (the installation company) who gets paid the grant. It couldn’t be simpler.

Note must be taken regarding larger installations and the surrounding infrastructure including additional works that may be required.